The total coverage depends on number of users, build out finish speed, and physical geography.
The build out can reach 20-30 miles. Usually if you live with in 30 miles of the build out you are covered. Usually.
One thing to remember. If your city is on the list to get wimax. It does not stop. Baltimore, Portland, Los Vegas, are all still being built and expanded.
So if you do not get it at first turn on, it could be only a few months later.
Looking at the 3g coverage. Anything in orange should be covered in the first round. Because the tower placement wimax is added on to 3g towers. So the area in orange should be covered.
But that is depend alot of things, but it is a good indicator.
I can not promise you it will, but more then likely it will.